Blue Ox, Fuse Bypass Switch; Mini Fuse; Long Lead

$69.49
In stock
SKU
BX88272
Fuse Bypass; Fuse Bypass Switch; Mini Fuse; Long Lead

Attributes

  • Type: Mini Fuse
  • Operation: With Switch
  • Location: Next To Fuse Box
  • Estimated Install Time (Hours): 1
 

Product Description

Stop pulling fuses every time you tow. now you can disconnect your fuse with the flip of a switch. this switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode.
 

Features & Benefits

  • Switch Provides A Safe Alternative To The Constant Removal And Reinstallation Of The Fuse When Changing From The Towed Mode To The Driving Mode
  • Designed To Make Towing Safe And Easy
  • Designed For Performance
  • Products Are Built On A Long Tradition Of Quality
  • Limited 1 Year Warranty
More Information
Weight 1.000000
mfg_part_number BX88272
upc 798459086095
Write Your Own Review
You're reviewing:Blue Ox, Fuse Bypass Switch; Mini Fuse; Long Lead

WARNING: This product can expose you to chemicals known to the State of California to cause cancer and/or birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

Copyright © 2025-present RV-Mall. All rights reserved.